CHAPTER 53: SEWER
Section
   53.01   Authority
   53.02   Definitions
   53.03   Construction permits for on-site sewage systems
   53.04   Professional standards
   53.05   On-site soil evaluation
   53.06   Recommended set-aside areas
   53.07   Septic tank requirements
   53.08   Sewage holding tanks
   53.09   Distribution boxes
   53.10   Sand lined system sizing
   53.11   Construction and final inspections
   53.12   Connection or reconnection to an existing on-site sewage system
   53.13   Enforcement
   53.14   Procedure for appeal
   53.15   Remedies
   53.16   Fee schedule
 
   53.99   Penalty