(A) All lots that will utilize on-site sewage systems platted after the effective date of this chapter shall have at least one acre of land.
(B) It is recommended that for new construction, two areas on each lot be evaluated by a soil scientist for suitability for installation of an on-site sewage system and plans for the property include preservation of the set-aside area. In the event of system failure or malfunction, the set-aside area should remain undisturbed and available for installation of a replacement system.
(C) No residential on-site sewage system construction permit will be denied due to lack of a suitable set-aside area alone.
(Ord. 2023-20, passed 11-6-2023)