1163.03 CORRECTION PERIOD.
   All violations shall be corrected within a period of ten days after the written order is issued or within a longer period of time if indicated by the Zoning Administrator in the written order. Any violations not corrected within the specified period of time shall be reported to the Law Director, who shall initiate prosecution procedures.
(Ord. 86-260. Passed 12-16-86.)