1121.06 SURVEY AND PERMANENT MONUMENTS.
(a) Location of Survey Monuments. One monument satisfactory to the engineer of jurisdiction shall be placed at each corner and at each change in direction of the boundary; and one such monument shall also be placed at each street intersection on the right-of-way line and at the beginning and end of curves on the right-of-way line.
In addition, all lot corners must be identified with three-fourths inch diameter pipe markers.
(b) Permanent Monuments. Permanent monuments shall be placed in the same locations as required for survey monuments. A permanent monument shall be concrete with a minimum size of six inches diameter by thirty inches long with a one-inch reinforcing bar or pipe cast in the center. The top of all permanent monuments shall not extend above the finished grade.
(c) Certification of Permanent Monuments. Before final acceptance of the street improvements by the local governing body, the subdivider or developer shall, through a registered engineer or surveyor, certify to the local governing body that all required permanent monuments are in place or that those removed during construction have been replaced.
(Ord. 73-499. Passed 12-18-73.)