(A) The town requires the user to provide and operate, at the user’s own expense, monitoring facilities to allow inspection, sampling, and flow measurement of the building sewer, and/or internal drainage systems. The monitoring facility should normally be situated on the user’s premises, but the town may, when such a location would be impractical, or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area, and located so that it will not be obstructed by landscaping or parked vehicles.
(B) There shall be ample room in, or near, such sampling manhole, or facility, to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe, and proper, operating condition at the expense of the user.
(C) Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with the requirements of the town, and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the town.
(Ord. 33-2002, passed 10-21-2002)