Whenever the elevation of the subgrade is above the existing surface, the materials required to make the necessary fill shall be deposited and spread to layers or courses of not more than six (6) inches in thickness over the entire area to be thus filled. Each layer or course shall be thoroughly compacted by use of a sheepfoot roller propelled by a tractor or by rolling with a self propelled steam or gas roller of not less than eight (8) tons.