Upon any stoppage of the work, all material shall be piled up neatly by the contractor, so as not to impede the travel on the sidewalks, or at the intersection of streets, or the use of fire plugs. Upon completion of the work, all rubbish or surplus material must be removed immediately from the street by the contractor.