§ 5-2-1-7. APPLICATION FOR RIGHT-OF-WAY PERMIT.
   (A)   The application for a right-of-way excavation permit shall be submitted to and approved by the City Engineer on forms approved by the Board and, at a minimum, include the following:
      (1)   A properly executed permit application, in the form designated by the Engineer, including but not limited to the following information:
         (a)   The name and address of the contractor responsible for the work;
         (b)   The nature of, and the reason for, the work to be performed;
         (c)   The location of the worksite and the dimensions of the excavation, including a map and specifications which shall show the existing conditions; the proposed location with reference to the grade lines; the surface of the street(s); the dimensions and material of the conduit, pipeline(s), electrical wiring, or other devices; and the manholes, appliances and connections to be used therewith;
         (d)   The anticipated length of time to complete the work;
         (e)   The method of traffic control to be used by the applicant at the worksite;
         (f)   Any other pertinent information requested by the City Civil Engineer.
         (g)   A maintenance bond as identified in § 5-2-1-6; and
   (B)   All these plans and specifications shall be furnished by and at the expense of the applicant.
(Am. Ord. 15, 2020, passed 12-7-2020) Penalty, see § 1-1-2-3