Skip to code content (skip section selection)
Compare to:
Kingman Overview
Kingman, KS Code of Ordinances
KINGMAN, KANSAS CODE OF ORDINANCES
ADOPTING ORDINANCE
CHAPTER I: ADMINISTRATION
CHAPTER II: ANIMAL CONTROL AND REGULATION
CHAPTER III: BEVERAGES
CHAPTER IV: BUILDINGS AND CONSTRUCTION
CHAPTER V: BUSINESS REGULATIONS
CHAPTER VI: ELECTIONS
CHAPTER VII: FIRE
CHAPTER VIII: HEALTH AND WELFARE
CHAPTER IX: MUNICIPAL COURT
CHAPTER X: POLICE
CHAPTER XI: PUBLIC OFFENSES
CHAPTER XII: PUBLIC PROPERTY
CHAPTER XIII: STREETS AND SIDEWALKS
CHAPTER XIV: TRAFFIC
CHAPTER XV: UTILITIES
CHAPTER XVI: ZONING AND PLANNING
TABLE OF SPECIAL ORDINANCES
PARALLEL REFERENCES
Loading...
§ 4-211 SAME; APPLICATION INFORMATION REQUIRED.
   (a)   (1)   A building permit shall be issued upon an application in writing to the office of City Clerk on a form or forms provided for the purpose.
      (2)   This application shall, among other things, disclose the following:
         (A)   The name of the owner of the lot or tract of ground;
         (B)   The location of the building or structure;
         (C)   The building work proposed;
         (D)   The outside dimensions of the building by floors and dimensions of the basement (if any);
         (E)   The class of occupancy;
         (F)   The class of construction;
         (G)   The kind of materials to be used for walls, floors, ceilings, roofs and foundations;
         (H)   The estimated cost of the work;
         (I)   The date work will commence;
         (J)   Expected date of completion;
         (K)   Name and address of contractor or contractors doing the work; and
         (L)   Such other information as may be pertinent to the issuance of the required permit.
   (b)   (1)   An application for a building permit shall be signed by the owner or his or her duly authorized agent, or a building contractor licensed by the city. If the application is made by the owner or his or her agent, it shall contain the name or names of the licensed contractor or contractors doing the work described, or a building permit may be issued to the owner upon his or her application disclosing satisfactory evidence that the proposed work will be performed by the owner, himself or herself and not by a licensed contractor, and likewise subject to the final approval of the Building Inspector for work performed.
      (2)   If an application for a building permit indicates that it is for commercial or residential roofing services, including construction, installation, renovation, repair, maintenance, alteration or water-proofing, the application shall include the contractor’s name, the contractor’s place of business within the city (and home office if not a resident), the contractor’s state registration number as issued under the State Roofing Registration Act (K.S.A. 50-6,121 et seq.), and shall also be signed by the roofing contractor or contractor’s authorized agent; provided, however, that this division (b)(2) shall not apply to:
         (A)   An actual owner of commercial or residential property who physically performs, or has employees who perform, roofing services on such owner’s own dwelling or other structures located on the residential property without the assistance of a registered roofing contractor;
         (B)   To those persons identified in K.S.A. 50-6,129(a)(1) through (a)(8), and amendments thereto; or
         (C)   To an “exempt general contractor”, as defined in K.S.A. 50-6,122, and amendments thereto.
      (3)   If the application for a building permit indicates that it involves renovation, repairing or painting of a home or child-occupied facility, including day care centers and schools, built before 1978 and will disturb six square feet of painted interior surfaces or 20 square feet of painted exterior surfaces, the contractor performing the services must furnish proof of state certification as a licensed renovation firm or renovator; provided, however, that this division (b)(3) does not apply to a home owner performing work on an owner-occupied residence. In addition, this division (b)(3) does not apply to any other exception or exemption set forth in the State Department of Health and Environment Renovation, Repair and Painting Rule, as described in K.A.R. 28-72-1:54 and in 40 C.F.R. pt. 745, and amendments thereto.
   (c)   Upon approval of the completed application, including, if required, the verification of state roofer registration or other state certification, and a determination that a permit should be issued, the Chief Building Official or his or her assistant shall issue a permit to the owner or contractor authorizing the building work covered by the application. If applicable, the permit shall include the roofer registration number or any other certification or license number issued by the state.
   (d)   Any permit issued under this section shall be valid and subsisting for a period of not more than six months from the date of issuance unless the permittee shall have commenced, within the period so limited, the building work authorized by such permit. BUILDING WORK COMMENCED for the purpose of this section shall mean the beginning of building work other than the preparation of plans or the staking out of the building location or the letting of a building contract.
§ 4-212 SAME; PLANS AND SPECIFICATIONS.
   Whenever an application for a building permit is made, the Chief Building Official may, if he or she finds it necessary to determine whether building work described in the application will comply with the laws pertaining to such work, require that the applicant file a written description or drawing of the proposed building as may be prepared for the purpose. If such drawing or description is insufficient for the purposes of determining whether a permit should be issued, the Building Official may require the applicant to file complete architectural and engineering plans and specifications for such building, or any part thereof, as may be necessary for the Inspector to determine compliance with this article. The filing of such plans and specifications and the approval thereof in connection with an application for a permit shall not in any way affect the authority of the city to deny or issue a permit, or to inspect any building work for conformity with this article.
§ 4-213 SAME; FEES.
   (a)   The fee for a building permit shall be as approved by the governing body and listed in the latest City of Kingman Schedule of Fees.
   (b)   The fee herein shall be paid to the City Clerk upon obtaining a building permit and the same shall be credited to the General Operating Fund of the city.
(2010 Code, § 4-213) (Ord. 1861, passed - -)
§ 4-214 SAME; POSTING.
   A copy of the building permit shall be kept on the premises for public inspection during the performance of the work and until the completion of the same. The Building Inspector may require a certified copy of the approved plans to be kept on the premises at all times from the commencement of the work to the completion thereof.
§ 4-215 CERTIFICATE OF APPROVAL.
   Upon the completion of any work under a building permit, the Chief Building Official or the Building Inspector or his or her designee is authorized to issue a certificate of approval for the occupancy and use of the building or structure. The certificate shall show the number of inspections made and the orders and corrections required during the course of the work. A copy of such certificate shall be given the owner.
§ 4-216 INSPECTIONS OF BUILDING; LAYOUT OF BUILDING; FOUNDATIONS AND FOOTINGS; NOTICE TO INSPECTOR.
   (a)   The contractor or builder having a permit for new construction, or additions to existing buildings, shall notify the Chief Building Official or Building Inspector immediately upon the marking or laying out of the site and foundation for such work. The Official or Inspector shall inspect the layout for conformity with this article and with respect to lot lines, setbacks and location of the proposed buildings to determine conformity with the city zoning regulations. In case of doubt respecting the required location, the Chief Building Official may require an official survey of the lot lines to determine conformity, at the expense of the permit holder.
   (b)   Upon completion of the excavation for the building foundation and footings and the construction of the necessary forms thereof and before the foundation and footings are poured or laid, the Official or Inspector shall be notified as in the first case, and it shall be his or her duty to inspect all such work for conformity with laws respecting location of the building foundations and footings.
   (c)   The Building Inspector shall, during the course of all building, make such other inspections as may be directed by the Chief Building Official to be made during any successive stage of the construction or other work covered by a permit in order to secure compliance with laws pertaining thereto.
§ 4-217 REQUEST FOR INSPECTION.
   Upon the completion of any building construction work covered by this article, it shall be the duty of the person doing such work to notify the Building Inspector and request that it be inspected; after which such work shall be inspected promptly as hereinafter provided.
Loading...