1111.05 STORM SEWER SYSTEM.
   (a)    Proposed storm sewers, including grades, pipe sizes, manholes, inlets and appurtenances may be shown on the street improvement plans. The plans shall be submitted to the Village Clerk at least one week in advance of a regularly scheduled Council meeting. Installation and materials shall be in conformity with Village standards and the standards of the Ohio Environmental Protection Agency.
   (b)    The owner or developer shall follow the recommendations of the Village Engineer with regard to the proper method and direction of drainage storm water following review of the proposed plan of such drainage as submitted by the subdivider or his engineer.
   (c)    The storm sewer plans, if not incorporated as part of the street improvement plans, shall bear the approval of the Village Engineer and the Manager. Places shall be provided for their signatures, and that of the Village Clerk.