1367.06 BOND REQUIRED.
No permit to construct any building referred to in Section 1367.02 within the City shall be issued until the applicant therefor has posted with the Finance Director a cash bond as follows:
1,000 to 5,000 gallons per day |
$500.00 |
5,000 to 20,000 gallons per day |
750.00 |
20,000 or more gallons per day |
1,000.00 |
This bond shall remain on deposit with the City until the waste water treatment plant has been discontinued, and the sewer system serviced by the plant has been attached to the sanitary sewer system of the City.
The applicant, in posting this bond, authorizes the inspector, in the event that proper maintenance or repairs are not performed within ten days after notice as specified in Section 1367.05, to notify the maintenance firm, authorize maintenance or repairs, and pay the cost of maintenance or repairs out of the cash bond on deposit.
When the waste water treatment plant is discontinued and connection made to the sanitary sewer system of the City, any undistributed cash from the cash bond shall be returned to the owner. (Ord. 1969-44. Passed 7-8-69. )