Loading...
No user shall increase the use of process water or in any manner attempt to dilute a discharge as a partial or complete substitute for adequate treatment to achieve compliance with § 53.037(A) of this code, or national categorical pretreatment standards.
(2004 Code, § 53.040) (Ord. 781, passed 7-19-1988) Penalty, see § 10.99
INDUSTRIAL WASTES; CONTROL
The Council may require each person who discharges or seeks to discharge industrial wastes to a public sewer to prepare and file with the Council, at times as it determines, a report that shall include pertinent data relating to the quantity and characteristics of the wastes discharged to the wastewater treatment facilities. In the case of a new connection, the Council may require that this report be prepared prior to making the connection to the public sewers.
(2004 Code, § 53.050) (Ord. 781, passed 7-19-1988)
If any waters or wastes are discharged or are proposed to be discharged to the public sewers, which waters or wastes contain substances or possess the characteristics enumerated in §§ 53.035 through 53.040 of this chapter and which, in the judgment of the Council, have a deleterious effect upon the wastewater treatment facilities, processes, equipment or receiving waters, or which otherwise create a hazard to life or health or constitute a public nuisance, the Council may:
(A) Reject the wastes;
(B) Require pretreatment to an acceptable condition for discharge to the public sewers, pursuant to § 307(b) of the Act, being 33 U.S.C. § 1317(b), and all addendums thereof;
(C) Require control over the quantities and rates of discharge; and
(D) Require payment to cover the added cost of handling and treating the wastes not covered by existing taxes or sewer charges under the provisions of this chapter.
(2004 Code, § 53.051) (Ord. 781, passed 7-19-1988)
(A) Each person discharging industrial wastes into a public sewer shall, at the discretion of the Council, construct and maintain one or more control manholes or access points to facilitate observation, measurement and sampling of wastes, including sanitary sewage.
(B) (1) Control manholes or access facilities shall be located and built in a manner acceptable to the Council. If measuring and sampling devices are to be permanently installed, they shall be of a type acceptable to the Council.
(2) Control manholes, access facilities and related equipment shall be installed by the person discharging the waste, at his or her expense, and shall be maintained by him or her so as to be in safe condition, accessible and in proper operating condition at all times. Plans for installation of the control manholes or access facilities and related equipment shall be approved by the Council prior to the beginning of construction.
(2004 Code, § 53.052) (Ord. 781, passed 7-19-1988) Penalty, see § 10.99
(A) Measurement of flow. The volume of flow used for computing sewer service charges shall be the metered water consumption of the property owner as shown in the records of meter readings maintained by the Water Department or utility, except as noted in division (B) below.
(B) Metering of waste. Devices for measuring the volume of waste discharged may be required by the Council if this volume cannot otherwise be determined from the metered water consumption records. Metering devices for determining the volume of waste shall be installed, owned and maintained by the person discharging the wastewater. Following approval and installation, these meters may not be removed without the consent of the Council.
(2004 Code, § 53.053) (Ord. 781, passed 7-19-1988)
(A) Industrial wastes discharged into the public sewers shall be subject to periodic inspection and a determination of character and concentration of the wastes. The determination shall be made by the industry as often as may be deemed necessary by the Council.
(B) Samples shall be collected in a manner so as to be representative of the composition of the wastes. The sampling may be accomplished either manually or by the use of mechanical equipment acceptable to the Council.
(C) Installation, operation and maintenance of the sampling facilities shall be the responsibility of the person discharging the waste and shall be subject to the approval of the Council. Access to sampling locations shall be granted to the Council or its duly authorized representatives at all times. Every care shall be exercised in the collection of samples to ensure their preservation in a state comparable to that at the time the sample was taken.
(2004 Code, § 53.054) (Ord. 781, passed 7-19-1988)