The design of the drainage systems and roadways shall be in accordance with the various standards and requirements described in Sections 1139.04 and 1139.06. Drawings and specifications for the improvements shall be reviewed and approved by the Village Engineer, and the installation shall be subject to his or her continuous inspection. At the completion of the construction and before acceptance, the developer shall furnish the Village a set of record or "as-built" tracings showing the locations, sizes and elevations of all underground utilities.
(Ord. 1988-121. Passed 11-22-88.)