Chapter 15.16
HEATING AND COMMERCIAL PROCESSING EQUIPMENT
Sections:
   15.16.010   Plumbing inspector-Appointment-Duties.
   15.16.020   Permit-Required.
   15.16.030   Permit-Fees.
   15.16.040   Business license-Required when-Requirements.
   15.16.050   Venting of gas appliances.
   15.16.060   No soft solderjoints permitted.
   15.16.070   Warm air-Preparation of furnaces-Installation of conversion gas burners.
   15.16.080   Steam, hot water and vapor boilers.
   15.16.090   General installation requirements and rulings.
   15.16.100   Circulating heater standards and requirements.
   15.16.110   Fuel oil storage tanks-Capacity, setting and piping.
   15.16.120   Fuel storage tanks-Venting.
   15.16.130   Oil burner installation and preparation of heating plant.
   15.16.140   Burner controls.
   15.16.150   City nonliability.
   15.16.160   Penalty for violation-Variances.