15.16.030 Permit-Fees. 
   Fees shown below for the permit are required to be paid when the permit application is filed. They are based on the net input of the fuel burning device.
   A.   Up to twelve thousand Btu per hour (intermittent heat use), no permit and no inspection required.
   B.   Twelve thousand Btu and larger:
      1.   Above floor level, two dollars;
      2.   Below floor level and basement installations, four dollars.
(Prior code § 14.301(d))