In support of the permit application, an industrial user shall submit, in units and terms appropriate for evaluation, all information as required by the director to evaluate the permit application. This information shall include, but not be limited to: industrial process identification; flow rates; wastestream constituents and characteristics; time and duration of discharge; peak discharge amounts; locations of all discharge points; pretreatment facilities; sampling and monitoring equipment and points; description of activities, facilities, and plant processes, including raw materials, processes and types of materials that are or could be produced; number of employees; site diagrams; and flow schematics. Specific information required for application evaluation will be identified in the permit application package. A statement shall be included, which describes possible subcategories that may be applicable, supporting evidence for applicability of each subcategory and certification of factual information. After evaluation of the information submitted, the director shall determine if an industrial wastewater discharge permit is required. If the director so determines, a permit may be issued subject to the terms and conditions provided in this chapter.
(1990 Code, Ch. 14, Art. 5, § 14-5.2) (Added by Ord. 94-46)