Sections
16-14.1 Intent
16-14.2 Scope
16-14.3 Site criteria
16-14.4 Enhanced hurricane protection area program requirements
16-14.5 Design wind, rain, and impact loads
16-14.6 Ventilation
16-14.7 Standby electrical system capability
16-14.8 Quality assurance
16-14.9 Compliance re-certification if altered, deteriorated, or damaged