A. Application: The conceptual design of any application for development located in the RO zone which requires approval by the planning commission shall be reviewed by the DRB as provided in this section.
B. Scope: A DRB review and recommendation is required for the following development in the RO zone:
1. All new building construction;
2. Any remodeling which increases the floor area of an existing building; or
3. Any exterior remodeling, as defined by the international building codes, of an existing main building.
C. Submissions: An application subject to design review shall include all of the requirements of section 13.03.040H of this title.
D. Recommendation: The DRB shall review the proposed conceptual design plan for compliance with the RO design guidelines set forth in section 13.50.190 of this chapter. At the conclusion of the review, the DRB shall make a recommendation to the planning commission to accept the design concept as submitted, provisionally accept the design concept subject to plan revisions necessary to achieve compliance with the design guidelines, or continue design concept for preparation of a new design concept if the concept is substantially out of compliance with the design guidelines. (Ord. 2014-05, 4-17-2014)