Skip to code content (skip section selection)
Compare to:
Holladay Overview
Holladay, UT Code of Ordinances
CHAPTER 17.16
CONSTRUCTION OF DRAINAGE FACILITIES
SECTION:
17.16.010: Generally
17.16.020: Removal Of Property From Benefited Area
17.16.030: Studies Of Needed Facilities
17.16.040: Design Criteria
17.16.050: Map Requirements
17.16.055: Responsibility Of Owner Or Developer
17.16.060: Plans And Specifications Required
17.16.070: Acquisition Of Easements And Rights Of Way
17.16.080: Construction Of Facilities
17.16.090: Inspection By Department
17.16.110: Temporary Facilities Permitted When
17.16.120: Connection To Facility Required
17.16.130: Performance Guaranties
17.16.010: GENERALLY:
The provisions of this chapter apply where the city constructs intermediate or major drainage system facilities or requires a private owner or developer of property to construct intermediate or major drainage system facilities that may be used by owners or developers of other property. The provisions of this chapter detail the manner in which such facilities may be constructed by a private owner or developer and the manner and cost of connection of such system by another owner or developer. (1999 Code; amd. Ord. 2020-05, 4-16-2020)
17.16.020: REMOVAL OF PROPERTY FROM BENEFITED AREA:
Upon written request from the owner of any real property to have their real property excluded from a drainage system on: a) showing that such real property can be developed in a manner consistent with the retention plan designated in chapter 17.24 of this title; and b) submitting written election acceptable to the city in recordable form that the owner shall not make alterations or improvements that will result in excess waters from storm or flood draining into the drainage system, and that such election is binding on successors and assigns, the owner's property shall be excluded by the city from the drainage system benefited area. Requests for exclusion from the benefited area shall be considered until final plans and specifications are approved by the department pursuant to section 17.16.060 of this chapter or sixty (60) days prior to the letting of bids for the construction of the intermediate and/or major drainage system facilities to be constructed by an owner or developer, whichever is later. Unless excluded, all real property within the drainage system benefited area will be subject to payment of applicable fees as a condition precedent to issuance of a building permit or construction of any improvements upon the real property. (1999 Code; amd. Ord. 2020-05, 4-16-2020)