Subject Matter | Fee | Section Reference |
Subject Matter | Fee | Section Reference |
Submittal or resubmittal of a preliminary plat | $100.00, plus $5.00 per lot | 12-4-3D1b |
Plan review and inspection fee | The cost incurred by the village for review of the engineering drawings and specifications by the village engineer, and inspection of the improvements by village staff or the village's designated representative shall be paid by the subdivider, on a monthly basis, not to exceed 2 percent of the total costs of construction of the subdivision | |
Submittal or resubmittal of a final plat | $100.00, plus $5.00 per lot | 12-4-6B1b |
Application fee for those submissions involving annexation agreements | $750.00 | 12-4-6B1c |
Penalty fee for commencing construction prior to the approval of the subdivision | $1,000.00, plus incurred cost of the village in inspecting and testing work performed prior to approval | 12-4-8C5 |
Application fee for resubdividing or replatting lots: | ||
Within village limits | $250.00 minimum, plus $25.00 per lot over 10 lots | |
Outside village limits | $500.00 minimum, plus $35.00 per lot over 10 lots | |
Application fee for PUD within the village extraterritorial region | $500.00 minimum, plus $35.00 per lot over 10 lots | |
Application fee for annexation involving PUD | $750.00 | |
Penalty fee for commencing construction prior to PUD approval | $1,000.00, plus incurred cost of the village in inspecting and testing work performed prior to approval | |
Application fee for those PUDs including manufactured housing (such as mobile home or trailer court) | $1,500.00, plus $100.00 per lot | 12-4-12H3 |
Fee in lieu of land dedication for parks, open spaces or recreational areas | $600.00 per acre | 12-6-2B2 |
(Ord. 2007-19, 5-21-2007; amd. 2011 Code)