34-3-11 STANDARDS FOR GRADING.
   (A)   All grading necessitated for the construction of pavement, curb and gutter, sidewalks, right-of-way and drainage facilities shall be done in such a manner so as to assure a uniform subgrade with adequate bearing capacity to properly support the loading/structures to be superimposed.
   (B)   All topsoil shall be removed from areas proposed for the construction of pavement, curb and gutter, or sidewalks, and under no circumstances shall said improvements be constructed on topsoil, or on any other soil not capable of meeting the specifications for compaction specified herein.
   (C)   The developer/subdivider shall show proposed final grades, at all rear lot corners, on the construction/improvement plans for all lots. The developer/subdivider shall place concrete markers at intervals not to exceed 100 feet or points on line along the flowline where a surface drainage swale is to be constructed with the top of the markers set at the design grade as shown on the plan drawings. Concrete monuments shall be a minimum size of four inches square and 30 inches long.
(Ord. No. 23- 005; 3-13-23)