CHAPTER 52:  SEWER
Section
General Provisions
   52.01   Connection to sanitary sewer required
   52.02   Refusal of use of system
   52.03   Prohibited discharges
   52.04   Industrial wastes
   52.05   Citation; appearance
   52.06   Failure to appear unlawful
Accounts; Billing; Fees and Rates
   52.20   Sewer rates
   52.21   Sewer connection fees
   52.22   Wastewater Collection and Treatment System Improvement Fund
   52.23   Connection regulations
Meters and Sewer Service Lines
   52.35   Independent sewer service line required
   52.36   Sewer service line maintenance
   52.37   Injury to or tampering with sanitary sewer system unlawful
   52.38   Installation and maintenance of sewer service line
   52.39   Metered service
Planning; Materials; Installation
   52.50   Grease traps required
   52.51   Interceptor or removal facilities required to remove harmful ingredients
   52.52   Sewer construction, plans, specifications, and inspection
   52.53   Rights to enter for inspection
   52.54   Record drawings and engineer’s certification
Permits
   52.65   Permits required
   52.66   Right to revoke permissions
 
   52.99   Penalty