§ 52.025 APPLICATION FOR PERMITS.
   Applications for permits to connect, tap, construct, modify or make attachments to public water shall be made to the Director of Public Works, City Engineer or Chief Building and Code Inspector. A fee, as set by resolution, to cover the cost of inspection, recording and other expenses shall accompany such applications. The application shall show the exact location of the proposed work, and when requested by the Director of Public Works or Chief Building and Code Inspector, the plumber shall provide plans or specifications of the proposed work. When required, an application shall be on file with the Director of Public Works or Chief Building and Code Inspector 24 hours before issuance of permit. If work is commenced prior to application for the permit, a fee as set by resolution, will be assessed. Each permit shall expire six months from date of issuance.
(Prior Code, § 52.020) (Ord. 3060, passed 10-7-1985; Ord. 03-40, passed 11-17-2003) Penalty, see § 52.999