Loading...
It shall be the duty of the Department of Public Works to read and inspect all water meters throughout the city. A billing statement showing the consumption of water in gallons shall be provided to the customer.
(Prior Code, § 52.043) (Ord. 3060, passed 10-7-1985; Ord. 03-40, passed 11-17-2003)
All water meters required pursuant to this chapter shall be equipped with a radio-read device to enable the Department of Public Works to take meter readings without having to enter the premises. Existing water meters shall be so equipped by the Department of Public Works as soon as practicable. All radio-reading devices and water meters shall remain the property of the city and shall be maintained by the city.
(Prior Code, § 52.044) (Ord. 3060, passed 10-7-1985; Ord. 03-40, passed 11-17-2003)
MAINS CONSTRUCTED BY PRIVATE PARTIES
All water main construction plans and specifications shall be reviewed and approved by the City Engineer. Prior to commencement of construction, the entity constructing the water main shall obtain a construction permit from the Nebraska Department of Health and Human Services after the water main construction plans and specifications have been approved as set forth above and before any water main construction work has commenced.
(Prior Code, § 52.057) Penalty, see § 52.999
Loading...