1143.10 PROCEDURES.
   Development in the S-1 Mixed Use District shall be permitted only after review and approval of a detailed development plan by the Board of Control according to the procedures set forth in this section:
   (a)   Preparation of a Detailed Development Plan. A proposal for development shall be accompanied by a detailed development plan prepared by a qualified professional, drawn to an appropriate scale. The detailed development plan shall include the following information, provided that the Zoning Administrator may waive certain submission requirements that are deemed unnecessary for the review and evaluation of such proposed development.
      (1)   Plat, plot plan. Plat, property lines of the parcel or parcels proposed for development including existing utilities, easements, street rights of way, and locations of existing principal buildings and land uses on adjacent parcels and across existing streets. Permanent parcel numbers of the development and adjacent parcels shall be included.
      (2)   Topography. Topographic maps showing existing and generally proposed grading contours at not greater than two (2) foot intervals, including integration into and topography on adjacent properties, wooded areas and trees of substantial size. The topography may be included on the plot plan.
      (3)   Principal and accessory buildings. The number, height, location and grouping of proposed dwelling units, nonresidential uses, recreational facilities and public uses, along with notation of the development standards for building spacing, setback from public streets and maximum building height.
      (4)   Traffic. The proposed system of on-site vehicular circulation, details for access to streets, methods for control of traffic, and an assessment of the impact of the proposed development on the existing circulation system; data showing the average and maximum volume of traffic expected to be generated by the development.
      (5)   Parking areas. The layout, dimensions and estimate of the number of parking spaces, the landscaping and other design features of the parking area and types of pavement, the loading and unloading areas.
      (6)   Outdoor lighting fixtures. The location, type and illumination intensity of any existing or proposed outdoor lighting fixtures.
      (7)   Signs. Indication of the size, location, color and nature of any existing or proposed signs on the property.
      (8)   Landscaping and screening plan. A preliminary description of the location and nature of existing and proposed vegetation, landscaping and screening elements; a proposed maintenance plan to ensure the upkeep of natural areas.
      (9)   Outdoor storage. The location and layout of all outdoor storage including storage of waste materials and trash receptacles.
      (10)   Architectural drawings. Complete architectural drawings including floor plans, elevations and specifications for the proposed development.
      (11)   Phasing, sequencing of project. A detailed statement of the phasing and staging of specific elements of the plan, including a proposed construction sequencing schedule.
      (12)   Utilities. Show proposed location of new utilities and authority to connect these into existing infrastructure. Storm Water must address requirements of Chapter 1335, Storm Water Management.
   (b)   Review for Completeness by the Zoning Administrator. Upon receipt of the proposal, the Zoning Administrator shall, within three (3) working days, make a preliminary review of the application to determine whether such application provides the information necessary for review and evaluation. If it is determined that such application does not provide the information necessary for such review and evaluation, the Zoning Administrator shall so advise the applicant of the deficiencies and shall not further process the application until the deficiency is corrected.
   (c)   Review by the Board of Control. The Board of Control shall review the proposal and shall grant approval only after determining that the proposal complies with the preliminary land use plan for the S-1 District and that the proposal is within the intent and purpose of the S-1 District and will not be harmful to surrounding properties. The Board may grant variances from relevant provisions of this chapter or from any other applicable provisions of the Zoning Code where practical difficulty is demonstrated. However, the Board shall not have the power to grant a use variance.
   (d)   Review by Planning Commission. It is intended that any detailed development plan which will substantially change the use(s), building(s), or traffic pattern(s), within the S-1 Districts shall be reviewed by the Planning Commission prior to Board of Control approval or disapproval. Therefore, when a proposed development plan involves the placement of buildings on previously undeveloped land or a change in the circulation of traffic within the District or a change in the basic use to which land or a building is devoted, the Board shall refer the development plan to the Planning Commission for approval, approval with modifications or disapproval. The Commission shall be allowed a reasonable time, not less than thirty (30) days, for its consideration and recommendation. If the Planning Commission disapproves the proposal within such thirty (30) day period or thereafter, but prior to voting by the Board of Control upon the proposal, the Board of Control shall not approve the proposal except by the concurring votes of not less than three-fourths (3/4ths) of the members of the Board of Control. Any proposal may be amended prior to the voting thereon by the Board of Control without further notice or postponement, if such amendment to the proposal is in accordance with the recommendation, if any, of the Planning Commission.
   (e)   Notice of Planning Commission Review. When such detailed development plan is referred to the Planning Commission, written notice shall be given by the Zoning Administrator to the applicant, the owner of property (if not the applicant), and to the owners of adjacent, abutting and contiguous properties. The notice shall either be hand delivered or sent by first class mail at least ten (10) days before the hearing by the Planning Commission on the development. The notice shall set forth the time and place of the hearing and the nature of the development proposal. The failure of any person to receive such notice shall not affect the right and power of the Planning Commission and/or Board of Control and/or Council to review such application or to take action on the application.
   (f)   Council Approval. Approval by the Board of Control of a detailed development plan shall not become effective unless and until it has been approved by Council. If Council takes no action in approving or disapproving the plan within thirty (30) days from receipt of certification of approval by the Board of Control, the action of the Board of Control in approving the proposal shall become in full force and effect.
   (g)   Building Permit. No building permit for the improvement of a parcel, or any portion thereof, or for the erection of any building shall be issued unless the detailed development plan has been approved in accordance with the provisions of this section. All construction and development under any building permit shall be in accordance with the approved, detailed development plan. Any departure from the approved plans shall be cause for revocation of the building permit.
   (h)   Amendments to Plans. The preliminary land use plan or a detailed development plan may be amended according to the following:
      (1)   An amendment to the preliminary land use plan shall be considered an amendment to the zoning map and shall be governed by Chapter 1119 of the Zoning Code.
      (2)   An amendment to the detailed development plan shall be governed by the provisions of this chapter pertaining to the approval of detailed development plans.
         (Ord. 105-2017. Passed 1-16-18.)