If a Facilities Operator must construct, reconstruct, alter, repair, remove or replace any culvert, sidewalk or driveway in any public street or road Right-of-Way, then the Facilities Operator shall obtain the required permit pursuant to Section 941.07 including, but not limited, to the construction bond set forth in Subsection 941.07(g).
(Ord. 54-2020. Passed 7-6-20.)