Skip to code content (skip section selection)
Compare to:

You are viewing an archived code

18-29-905.4  Vertical rise of vent.
   Every dry vent shall rise vertically to a minimum of 6 inches (150 mm) above the flood level rim of the highest trap or trapped fixture being vented.