You are viewing an archived code
Ducts shall be supported with approved hangers at intervals not exceeding 10 feet (3048 mm) or as specified in the SMACNA HVAC Duct Construction Standards – Metal and Flexible or by other approved duct support systems designed in accordance with the building code. Flexible and other factory-made ducts shall be supported at least every 5 feet (1524 mm).