You are viewing an archived code
For pile loads exceeding 25 tons for timber piles, or 40 tons for concrete piles, concrete-filled steel pipe piles, and rolled structural steel piles, the allowable pile load shall be determined by control load tests as required in Section 13-132-160.
(Prior code § 70-5.2)