You are viewing an archived code
Controlled materials as applied to the requirements of this Code means a building, structure, or part thereof which has been designed or constructed under the following conditions:
(a) All controlled materials shall be selected or tested to meet the special strength, durability and fire resistance requirements upon which the design is based.
(b) The design, preparation of working drawings, including details and connections, the checking and approval of all shop and field details and the inspection of the work during construction shall be under the supervision of a registered architect or structural engineer.
The records of all tests, inspections and detail approvals shall be made available to the building commissioner at all times during the progress of the work, and such records as he may designate shall be filed with the department of buildings.
(Prior code § 69-3.1; Amend Coun. J. 3-5-03, p. 104990, § 27; Amend Coun. J. 11-13-07, p. 14999, Art. II, § 1)