Skip to code content (skip section selection)
Compare to:

You are viewing an archived code

13-32-180  Boilers – Approval required.
   The size, number, and location of power or heating boilers to be installed in any building shall be marked on the plans, and, except in single dwellings, shall be approved by the building commissioner, before a permit is issued by the department of buildings for the erection of such building.
(Prior code § 43-14; Amend Coun. J. 9-13-89, p. 4604; Amend Coun. J. 12-4-02, p. 99026, § 2.11; Amend Coun. J. 11-13-07, p. 14999, Art. II, § 1)