911.19 CONSTRUCTION PERMIT.
   (a)   Facilities Operators are required to obtain a construction permit pursuant to Section 901.57 of the Codified Ordinances prior to commencing any of the following activities:
      (1)   Collocation of small cell equipment on a Wireless Support Structure;
      (2)   Replacement, modification, repair, or maintenance of small cell equipment;
      (3)   Construction, replacement, modification, repair, or maintenance of a Wireless Support Structure associated with a small cell facility; and
      (4)   Any excavation of the Right-of-Way in connection with the activities described in this subsection (a).
   (b)   The construction permit fee shall be the fee set forth in Section 900.18 of the Codified Ordinances.
(Ord. 3062. Passed 8-9-18.)