Upon abandonment, the owner shall physically remove the solar energy system within sixty (60) days from the date of abandonment. "Physically remove" shall include, but not be limited to:
(a) Removal of the solar energy system and related above grade structures.
(b) Restoration of the location of the solar energy system to its prior condition.
(Ord. 2019-39. Passed 8-13-19.)