1307.20 FINAL PLOT PLAN.
   Prior to filing an application for a certificate of occupancy under the Zoning Code, each applicant shall first file with the Building Inspector a final plot plan, which plot plan shall show the final grades of the improvement as constructed. Such plans shall be certified by a registered engineer or surveyor as to the accuracy of the plans depicting the actual construction and further certification that he has made actual field observation of as-built conditions and these conditions are as shown on the plans. The form of such certification shall be prescribed by the Municipal Engineer.
(Ord. 1978-1129. Passed 10-23-78.)