APPENDIX A: INFRASTRUCTURE SPECIFICATIONS AND STANDARDS
Section
Excavation and Backfill for Underground Conduits
   1-1   Description
   1-2   Construction details
   1-2.01   Surface removal
   1-2.02   Excavation by hand or machine
   1-2.03   Width of excavation
   1-2.04   Excavation below grade
   1-2.05   Rock excavation
   1-2.06   Braced and sheeted trenches
   1-2.07   Trenches with sloping sides, limited
   1-2.08   Short tunnels
   1-2.09   Piling excavated material
   1-2.10   Removal of water
   1-2.11   Safety
   1-2.12   Deviations occasioned by other structures or utilities
   1-2.13   Interruption to utilities
   1-2.14   Maintenance of traffic and closing of streets
   1-2.15   Construction in easements
   1-2.16   Underground conduit constructed in tunnel
   1-2.17   Excavation and foundation
   1-2.18   Backfill
Restoration of Surfaces
   2-1   General
   2-2   Construction details
   2-2.01   Temporary surface over trench
   2-2.02   Removal of pavement, sidewalk, driveway and curb
   2-2.03   Replacement of permanent type pavement, sidewalks, driveways, curbs, gutters and structures
   2-2.04   Replacing existing temporary street and alley surfaces
   2-2.05   Seeding and sodding
   2-2.06   Disposal of surplus excavated material
   2-2.07   Cleaning up
   2-2.08   Streets