(A) Applicability
The requirements of this Section 7.10.6 apply to all development plans and reuse/redevelopment plans for sites with frontage along corridors identified in the Comprehensive Transportation Plan, Cary Community Plan, or Wake Transit Plan for current or planned transit service. Previously developed sites are exempt from these requirements unless the proposed redevelopment of the site consists of alterations of existing transit access locations. Regardless of whether the LDO requires transit improvements, all development must comply with Americans with Disabilities Act (ADA) requirements and other applicable federal, state and local regulations.
(B) Requirements
(1) Transit Infrastructure
All sites subject to the requirements of this Section shall install at least one (1) transit access location. All transit access locations shall meet the requirements of the Town’s Standard Specifications and Details Manual. When the transit access location is located outside of the right-of-way, a permanent transit easement is required.
(2) Exemption
A new transit access location shall not be required if there is a nearby alternate transit stop or facility that serves the same function as a transit access location and that satisfies a transit stop spacing pattern of approximately one thousand (1,000) feet along the same side of the street on the subject corridor. This exemption shall not apply to major transit trip generators.
(Ord. No. 06-009, adopted 4-27-06; eff. 4-27-06; Ord. No. 2007-04, 3-22-07; Ord. No. 2007-21, 12-13-07; Ord. No. 2008-LDO-01, 9-25-08; Ord. No. 2010-LDO-05, 12-16-10; Ord. No. 2012-LDO-06, 8-9-12; Ord. No. 2013-LDO-02, 6-13-13; Ord. No. 2014-LDO-03, 8-14-14; Ord. No. 2015-LDO-001, 4-21-15; Ord. No. 2015-LDO-005, 11-19-15; Ord. No. 2017-LDO-01, 1-24-17; Ord. No. 2018-LDO-03, 11-15-18; Ord. No. 2021-LDO-01, 6-24-21)