Skip to code content (skip section selection)
Compare to:
CHAPTER 1109
Improvements
1109.01   Design requirements.
1109.02   Standards for improvements.
1109.03   Engineer’s approval required.
1109.04   Permits for construction.
1109.05   Security for construction.
1109.06   Cost of inspection, supervision, etc.
1109.07   Construction of buildings.
1109.08   Time for construction of improvements.
1109.09   Street construction.
1109.10   Water supply.
1109.11   Storm drainage.
1109.12   Sewerage.
1109.13   Street signs.
1109.14   Construction plans.
1109.15   Inspection.
1109.16   Maintenance after approval.
1109.17   Fire hydrants.
 
CROSS REFERENCES
Adoption of general rules and regulations for construction of improvements - see Ohio R.C. 711.101
Improvements defined - see P. & Z. 1101.01(a)(9)
Public improvements policy - see P. & Z. 1105.14
Design standards - see P. & Z. Ch. 1111
 
 
1109.01 DESIGN REQUIREMENTS.
   The design of all improvements, including grades of streets, type of pavement, drainage, sidewalks, sanitary sewers, storm sewers, water distribution facilities and street lighting facilities shall conform to the requirements of the Engineer. The preliminary plat should set forth the character and general details of the development and shall be accompanied by plans and statements regarding the details of improvement such as grading, draining, paving, sidewalks, street lights, storm and sanitary sewers and water mains. The subdivider may be required to extend improvements to boundaries of the proposed subdivision to serve adjoining land. (Ord. 1973-10. Passed 1-8-74.)
1109.02 STANDARDS FOR IMPROVEMENTS.
   Before the Council will officially accept any street improvements, water distribution facilities, sidewalks, street lighting facilities or storm and sanitary sewer facilities in a subdivision and become responsible for their maintenance, supervision and repair, such improvements shall be constructed in accordance with the Construction and Material Specifications of the Village in effect at the time the improvements are made and Council shall have received a certificate of conformance from the Engineer. Monuments shall be placed at angle points, points of curves in streets, and at such other points as required by the Engineer. Monuments shall be of such material, size and length as may be approved by the Engineer.
(Ord. 1973-10. Passed 1-8-74.)
1109.03 ENGINEER’S APPROVAL REQUIRED.
   At least four copies of detailed plans and specifications for all improvements shall be submitted to the Engineer and meet his approval before any construction shall proceed. Such plans shall be prepared by an Engineer, licensed in the State of Ohio. The Village shall maintain a competent inspector on the job when improvements are being constructed. The cost of the services of the Engineer in review and approval of detailed plans and specifications, the cost of inspection and supervision of construction shall be reimbursed to the Village by the developer. (Ord. 1973-10. Passed 1-8-74.)
Loading...