CHAPTER 1329
Topsoil Removal
1329.01   Removal permit required; permit fee.
1329.05   Minimum remaining topsoil after removal.
1329.02   Removal near streets or dwellings restricted.
1329.06   Replanting required after removal; cash bond.
1329.03   Creation of nuisances prohibited.
1329.04   Continuation of adequate drainage.
1329.99   Penalty.
   CROSS REFERENCES
   Notice to fill or drain lots - see GEN. OFF. 521.05 
   Street excavations - see S. & P. S. Ch. 901
   Surface drainage - see BLDG. 1301. 05(a) (RDH 1523.01)
   Grading prior to development - see BLDG. Ch. 1325 
   Grading developed lands - see BLDG. Ch. 1327