Permission to construct or connect a building sewer or drain connection with a public storm sewer shall be governed by the following requirements:
Such building sewer or drain may be used for the removal of surface water, rain water from roofs, subsoil drainage, building foundation drainage, cistern overflow, clear water from condensers, waste water from water motors and elevators and any other clean and unobjectionable waste water. Such building sewer or drain shall not receive sewage, floor drainage, industrial wastes, septic tank overflow, cesspool overflow, privy vault drainage, kitchen wastes or any other liquid wastes of objectionable character.
(Ord. 473. Passed 10-7-29.)