9-3-3: ELECTRICAL PERMIT 1 :
   A.   Permit Required: Upon the regular adoption of the standards and specifications, rules, and regulations, and fees referred to in subsection 9-3-1B2 of this chapter, the same shall at once become effective, and thereafter no electrical equipment shall be installed or altered except upon a permit first issued by the Electrical Inspection Department.
   B.   Permit Fees: The permit fees for the issuance of electrical installation permits shall be governed by the fee schedule as set forth in subsection 9-3-1B2. (Ord. 96-6, 8-5-1996; amd. Ord. 2020-5, 2-18-2020)

 

Notes

1
1. See title 3, chapter 10 of this Code.