10-2.03   Additional Duties.
   The Electrical Inspector shall be charged with the duty of enforcing the current National Electrical Code, City ordinances and all laws pertaining to the installation of electrical equipment, and for the protection of lives, property and fire prevention. The Electrical Inspector shall, upon a rough-in inspection, check for proper wiring methods, wire size, box fill, conduit sizing, grounding and conformity with the current National Electrical Code. A rough-in sticker shall be placed in the electrical panel to confirm that the installation has passed. The Electrical Inspector shall, upon final inspection, check conformity with the current National Electrical Code and all other requirements. If a rough-in inspection is not performed, the Electrical Inspector shall check for proper wiring methods and conformity with all other requirements. Upon final inspection, a "Final Inspection Sticker" shall be placed in the electrical panel to confirm that the installation has passed. A "C" (Certificate of Compliance Form) shall be provided to the master electrician upon final approval.
(Ord. BG80-63, S10-23, 7/15/80; Ord. BG2001-14, 3/20/2001; Ord. BG2004-66, 12/21/2004)