§ 52.09 AS-BUILT PLANS AND SPECIFICATIONS.
   (A)   The designer of the stormwater control plans shall provide as-built plans of all stormwater control and management plans showing the field location, size, depth, and planted vegetation of all measures and devices as installed. If the previously submitted plans remain unchanged, an as-built certification to the existing plans will be required. No certificate of compliance or occupancy shall be issued without said as-built plans.
   (B)   The designer shall certify, under seal, that the as-built stormwater measures and devices and their installation are in compliance with the county’s stormwater ordinance.
   (C)   The designer shall submit a final electronic file of the stormwater plan that is readable by GIS systems.
(2013 Code, § 20-10)