8-2-5: CORRECTIONS AND PROTECTIVE DEVICES:
   A.   Approval Required: Any user of Village water shall obtain written approval from the Water Department of any proposed corrective action or protective device before using or installing it.
   B.   Time Limitations: The total time allowed for completion of the necessary corrections shall be contingent upon the degree of hazard involved and include the time required to obtain and install equipment.
   C.   Separation By Village: If the cross-connection has not been removed within the time as hereinafter specified, the Village shall physically separate the Village water supply from the on- site piping system in such manner that the two (2) systems cannot be connected by any unauthorized person. (Ord. 175, 5-13-1983)