8-1-18: BUILDING OR CONSTRUCTION USE:
   A.   Application For Permit: Persons desiring to use Village water for building or construction purposes shall make application therefor in writing and file the same in the office of the Village Clerk on a form provided for that purpose.
   B.   Grant Of Permit; Connection: Upon a permit being granted (permits shall be issued in writing and signed by the Superintendent of the Water Department), the service pipe shall be carried at the expense of the applicant to the inside of the curb line, where a service cock and meter shall be placed, with pipe leading to the surface, and a faucet at the end thereof above the surface.
   C.   Completion Of Construction: When the building or construction work is completed, the faucet and meter shall be removed and the water shut off, unless permanent connection thereunder is made.
   D.   Cost Of Use: Charge for the use and connecting of meters shall be as prescribed in Section 8-1-9 of this Chapter. (Ord. 19A, 10-15-1947)