CHAPTER 52: STORM WATER SYSTEM
Section
   52.01   Definitions; rules of construction
   52.02   User charges
   52.03   Billing rates; inspection/connection fees
   52.04   Storm water discharge
   52.05   Rate adjustment
   52.06   Collection procedures
   52.07   Annual review of rates and charges
   52.08   Regulations; dumping prohibited
   52.09   Special rate contracts
   52.10   Appeal procedure
   52.11   Use of system; connections
   52.12   Initial connection fee
   52.13   Prohibited conduct
   52.14   Inspections
   52.15   Regulation of drainage tile and pipe located on private property
 
   52.99   Penalty