12-1-11: PERMIT PROCEDURES:
   A.   Application for Permit: Application for a development permit shall be presented to the Flood Plain Administrator on forms furnished by him/her and may include, but not be limited to, plans in duplicate drawn to scale showing the location, dimensions and elevation of proposed landscape alterations, existing and proposed structures and the location of the foregoing in relation to areas of special flood hazard. Additionally, the following information is required:
      1.   Elevation (in relation to mean sea level), of the lowest floor (including basement) of all new and substantially improved structures.
      2.   Elevation in relation to mean sea level to which any nonresidential structure shall be floodproofed.
      3.   A certificate from a registered professional engineer or architect that the nonresidential floodproofed structure shall meet the floodproofing criteria of subsection 12-1-9B2 of this Chapter.
      4.   Description of the extent to which any watercourse or natural drainage will be altered or relocated as a result of proposed development.
      5.   Maintain a record of all such information in accordance with subsection 12-1-9B1 of this Chapter.
   B.   Approval Factors: Approval or denial of a development permit by the Flood Plain Administrator shall be based on all of the provisions of this Chapter and the following relevant factors:
      1.   The danger to life and property due to flooding or erosion damage.
      2.   The susceptibility of the proposed facility and its contents of flood damage to the effect of such damage on the individual owner.
      3.   The danger that materials may be swept onto other lands to the injury of others.
      4.   The compatibility of the proposed use with existing and anticipated development.
      5.   The safety of access to the property in times of flood for ordinary and emergency vehicles.
      6.   The costs of providing governmental services during and after flood conditions including maintenance and repair of streets, bridges, public utilities and facilities such as sewer, gas, electrical and water systems.
      7.   The expected heights, velocity, duration, rate of rise and sediment transport of the flood waters and the effects of wave action, if applicable, expected at the site.
      8.   The necessity to the facility of a waterfront location, where applicable.
      9.   The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use.
      10.   The relationship of the proposed use to the Comprehensive Plan for that area. (Ord. 89-01, 1-3-89)