Sec. 10-3.418.   Slopes.
   (a)   Final slopes for in-channel material removal shall conform to the channel slope and sinuosity guidelines shown in Figure ____ of the CCRMP. Material removal shall be sloped in a downstream direction, towards the low-flow channel. When recommended by the TAC, alternate grading plans may be approved by the Director.
   (b)   In-channel material removal shall generally conform to the conceptual inchannel cross-section shown in Figure ___ of the CCRMP. When recommended by the TAC, alternate grading plans may be approved by the Director. (as amended by Ord. 1518, eff. February 13, 2020)