4-2-8: CLOSED SYSTEM AIR CONDITIONING FOR NEW CONSTRUCTION:
   A.   Installation Required: No new construction or new remodeling shall be permitted within the village unless such construction or remodeling shall provide for the installation of air conditioning equipment which does not require water for its operation or which uses a closed water cooled system whereby the water used is recycled. Nothing in this section shall be constructed to require the air conditioning of new construction or new remodeling.
   B.   Permit Issuance: No building permit or occupancy permit shall be issued by the village for any new construction or new remodeling unless the plans and specifications for such construction and the new construction or new remodeling as built comply with the provisions of this section. (Ord. 83-9, 6-28-1983)