(a) A permit shall be obtained for all excavations, fill or grade changes, excepting minor site alterations as determined by the Building Official or Village Engineer.
(b) All projects that require engineering review shall have the Engineer’s incurred costs and full compensation added to the total cost of the permit.
(Ord. 08-2004, passed 5-25-2004)