(A) Grading of all lots and streets within the village shall be accomplished in accordance with standards and specifications developed by the Village Engineer and on file with the Village Clerk.
(B) The Developer shall be responsible for mass grading of the entire subdivision. Upon excavation of any basement, the spoil materials shall be stockpiled on the lot and re-spread after back-filling to within four inches of finished grade for said lot to accommodate topsoil.
(Ord. 1995-0-25, passed 12-26-95)